2013年10月30日星期三

Screw the daily operation and maintenance

    Screw conveyor is used to seal conveying powder, granular, small block materials, general purpose conveyor , screw conveyor is widely used for different purposes in

different sectors as may be working Telescopic conveyor in a relatively harsh environment areas, such as the kinds of bearings are in the dust

Work, working conditions in such reasonable operation and maintenance of the screw conveyor on greater significance , the main requirements are as follows :
    1 , in the use of the normal operating procedures to operate, and often observe the screw conveyor is abnormal condition exists. If there is an abnormality please shut down

for inspection, screw conveyor troubleshooting before operation.
    2, please pay attention to safety , do not place your hands or other objects into the rotating parts .
    3 , during use , screw conveyor is strictly prohibited heavy start , start feeding should be preceded by the host , and then feeding ; should be checked before the start of

the cylinder body I is too much material .
    4 , in order to ensure that the requirements of the screw conveyor without load starting , conveyors feeding should be stopped before stopping , and other material inside

the chassis rear was completely lost all stopped .
    5 , in strict accordance with the mixer loading capacity : no more than the effective volume of the mixer used under strict overload use , it would burn or damage the gear

motor and other components . After adding the material must remember not to stop halfway , try to avoid overloading the next start-up.
    6 , the initial feed screw conveyor , the feed rate should be increased gradually until it reaches the conveying capacity , feeding should be uniform, or likely to cause

transport of materials product plugs, drive overload .
    7 , the material being transported shall not be mixed with chunks of hard materials to avoid causing death card spiral screw machine damage.
    8 , the normal operation of 1800 hours conveyor should be a small repair , mainly to check lubrication or replacement of wearing parts ;
    9 , the normal operation of 4000 hours or so should be overhauled , mainly for all assemblies demolition inspection and cleaning, replacement or correction of all wearing

parts and standard parts . When removing the screw conveyor please remember the clear sequence for assembly in the reverse order can be combined . Host computer

Helix and direction of rotation of the feed screw should follow the direction signs, strict reverse direction !

没有评论:

发表评论