As technology continues to introduce and improve production upgrade machinery to reach a very high specification , has been the demand can be satisfied with the present and
future needs of the construction norms, domestic foundation engineering and construction without bucket elevator equipment, system is a mechanical professional conduct essential
equipment. The feed is
Bucket elevator one of the most important 90 degree conveyor job process , feed is not reasonable not only affects the function of bucket elevators , and right after the sequence operations (
promotion and discharge process ) will attack chain reaction.
For grain, oil, feed mill workshop of bucket chain conveyor elevator feed forward feeding method , reverse feed and bi-directional feed , select the feed method which should speed of thought .
1 , when the lifting speed of the belt and the material flow into the base material when the flow rate are compared hours, usually used reverse feed bucket inside scoop on the
part of the base material and then filled directly from the inlet part of the material , which is fill factor conducive to progress.
2, if enhance the speed and flow of material with the base material when the flow rate is relatively large , the material impact on the larger bucket , reverse feed not only
fill factor affecting the progress of , and additionally increase the power consumption, in this case can be a forward feed .
3, if the fill factor is not easy to reach the required value , presenting " value " falters , then the feed can be bi-directional . Needs to clarify the grain, oil, feed mill
workshop of bucket elevator feeding method is very likely by the technical processes, technology planning the resolutions.
Vibration protection hoist capable of extensive analysis we carried out , surely we should also know how to protect the equipment, but does not know in detail the process of
implementation .
The first operation vibration hoist hoist equipment vibration , do not be afraid to waste money, see the end of all the production line without abnormal , boot empty load
operation eight hours , you are not mistaken , is to empty the load operation , that is to what materials does not increase , idling.
Why should we do ? Like just bought a new computer to the same end , we must first look at the boot operation , while not identical vibration hoist is in the empty -load
operation process, our operating personnel to stand next to , to keep the lubricating oil filling equipment increase next view all connected
Contacts are not reliable, load trial operation feed size of various models in strict accordance with the standard requirements , prohibited materials into greater delineation ;
Uniform feeding after another , the water content is not less than 10-15 % ( according to the material is not the same ) , feeding reaches new TB longitudinal vibration hoist
full load suspension ; load trial operation time 8-24 hours. New vibration hoist feed size stringent demands on delimitation , demarcation prohibit more than materials
Into the device , otherwise , it will cause vibration hoist accessories new impeller imbalances and excesses impeller wear , and even the formation of blocking the impeller
channel and the central feeding tube, the new vibration hoist can not work properly, if there is a slot somethin attack, we must first intercept power , and other host
After the job is aborted completely , then remove the card slot of the material , completely not in the device operating time, the device produced artificially disturbed .
Airport conveyor equipment belonging to airport cargo for bagged cargo transportation, Zhengzhou Modern Automation Equipment Co., LTD airport conveyor with safety and convenience features. At the airport using the airport conveyor can greatly reduce labor intensity and improve the efficiency of freight transport system.